Made in Auckland.

Three trades — upholstery, cabinetry, engineering — under one roof since 1995. One project manager. One delivery. One warranty.

In-house

Engineers. Welders. Carpenters. Upholsterers.

Most New Zealand furniture houses sub-contract two of the three trades — the upholsterer doesn't weld, the engineer doesn't stitch, so jobs get fragmented and accountability dilutes.

Titan runs all three under one roof. The same Auckland project manager who quotes your job watches the welder fabricate its frame, the cabinetmaker fit its top, and the upholsterer fit its cushions. One handoff. One delivery. One warranty.

For architects and specifiers, that means re-spec is fast (the answer comes from the floor, not a sub-contractor's queue), prototypes are real (built, not rendered) and install dates hold.

Three trades

What we make here

Upholstery
01

Upholstery

Frame-making, pattern-making, hand-tailored. Every banquette, booth and lounge module in the Titan range is built on the floor.

Capabilities
  • ·Hardwood frame construction
  • ·Pattern-making & cutting
  • ·Hand-finished buttoning, fluting, channelling
  • ·Re-upholstery of client's own frames
  • ·Specify any commercial fabric (Warwick, Innvik, Camira, COM)
Woodwork
02

Woodwork

Casegoods, joinery, panelling and tabletops. Wide-belt sander on site means flat tops up to 3.2 m.

Capabilities
  • ·Wide-belt sanding · max 1300 × 3200 mm panels
  • ·Solid timber, ply, veneer, MDF and laminate
  • ·Resin-pour and live-edge specialisms
  • ·Custom storage, banquette backs, panelling runs
  • ·Edge profiling and post-form curves
Engineering
03

Engineering

Welded steel frames, CNC tube bending, powder coat. We tube-bend in-house to ±0.2° on the Curvatubi.

Capabilities
  • ·MIG, TIG and spot welding
  • ·Curvatubi CNC tube bender · ±0.2° tolerance
  • ·Powder coat any RAL colour, in-house
  • ·Custom hardware, brackets, fixings
  • ·Stainless and mild steel, brass detail
The process

From brief to install in six clear steps.

Each step has a named owner inside the workshop. You see the same project manager from brief to install — they hold the timeline and the spec.

01

Brief

Floor plans, schedules, budget. We sit with the architect or designer and walk through scope, lead times and finish requirements.

02

Spec

Quote within two working days for standard items; five for custom. CAD blocks, BIM families and material samples supplied.

03

Prototype

For custom items, we build a workshop mock-up so you can sit on it before we commit fabric. Sign-off at this stage protects the schedule.

04

Build

Three trades run side-by-side on the workshop floor. One project manager covers your job end-to-end.

05

Finish

Quality check, packed, palletised. Photography by request before it leaves the floor.

06

Install

Delivered NZ-wide on Titan's own truck or specialist freight. Install team available for tricky sites.

Wide-belt sander
The numbers

What we can hold.

30+
Years trading
2,400m²
Workshop floor
±0.2°
CNC bend tolerance
3.2 m
Wide-belt capacity
Book a workshop tour →
Ready to start a project?

Send us a floor plan.
We will quote the furniture.

Two working days for a standard quote, five for custom. Drawings, finish schedules and BIM blocks supplied on request.